Public Works Capital Improvements and Major Repair Projects
• Interior and Exterior repainting, including replacement of control valves.
• New logos have been installed; the tank will be filled with water, disinfected, and tested for water quality before being placed in service.
• Tank Mixer Installed
- Tank Mixer will provide better conditions within the elevated storage tank for improved water quality and ensure compliance with proper disinfection residuals.


